Answer:
-1/2
Step-by-step explanation:
pass (0,1) (2,0)
slope = rise/run = -1/2
If point A is between B and C, then CA+AB = CB by the segment addition postulate. This is the idea of taking two smaller segments to "glue" them together to form a larger segment. Or you can think in reverse: take some larger segment and split it somewhere in between the endpoints (not necessarily the halfway point), this will produce two smaller segments.
For example: you have a ruler that is 12 inches. Take a saw and cut the ruler at the "2 inch" marker. You'll end up with two smaller pieces of plastic: one of which is 2 inches, the other 10 inches. The two smaller pieces can be taped together to reform the original 12 inch ruler.
Step-by-step explanation:
(2m + 4) / 8 = w
2m + 4 = 8w
2m = 8w - 4
m = 4w - 2
The diameter of the new rubber ball, to the nearest foot, must be D = 4.0 ft (in the case of the maximum cost).
<h3>
How to find the diameter of the ball?</h3>
Remember that for a sphere of diameter D, the surface area is:
A = 4*pi*(D/2)^2
In this case, the cost is $0.02 per square foot, and the company wants to expend (at maximum) $1 per ball, so first we need to solve:
$0.02*A = $1
A = $1/$0.02 = 50
So the surface of the ball must be 50 square feet.
Then we solve:
50ft^2 = 4*3.14*(D/2)^2
D = 2*√(50 ft^2/(4*3.14)) = 4.0 ft
If you want to learn more about spheres, you can read:
brainly.com/question/10171109