Answer: 24(2y−1)
Step-by-step explanation:
Factor 48y−24
48y−24
=24(2y−1)
Answer:
24(2y−1)
Answer:1)vertice 2) interesecting
Step-by-step explanation:
Answer:
- domain: (-4, ∞)
- range: [-4, ∞)
Step-by-step explanation:
The domain is the horizontal extent of the function. This function is defined for all values of x greater than (but not including) -4. Its domain is (-4, ∞).
__
The range is the vertical extent of the function. This function gives output values of any number greater than or equal to -4. Its range is [-4, ∞).
__
Interval notation uses square brackets when the value is included in the interval. It uses round brackets (parentheses) when the end value is not included in the interval. ∞ is not a number, so that end always gets a round bracket.
Answer:
y=-5/6x-5
Step-by-step explanation:
0-(-5)/-6-0
-5/6 slope
y-(-5)=-5/6(x-0)
y+5=-5/6x
y=-5/6x-5
Answer:
production cost f(x), in dollars, for x number of units produced by company 1:
f(x) = 0.05x^2 − 7x + 300
2) Table that represents the production cost g(x), in dollars, for x number of units produced by company 2:
x g(x)
0.6 899.58
0.8 899.52
1 899.50
1.2 899.52
1.4 899.58
3) Comparison: do a table for f(x) with the same x-values of the table for g(x).
x f(x) = 0.05x^2 − 7x + 300 g(x)
0.6 295.818 899.58
0.8 294.432 899.52
1 293.05 899.50
1.2 291.672 899.52
1.4 290.298 899.58
As you can see the values of f(x) are consistently lower than the values of g(x) for the same x-values.
The minimum production cost for company 2 is around 899.50 at x = 1, while the minimum production cost of company 1 is defintely lower (lower than 292.298 for sure, in fact if you find the vertex it is 55).
Answer: Based on the given information, the minimum production cost for company 2 is greater.
Step-by-step explanation: