1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
garri49 [273]
3 years ago
10

The use of technological advances in agriculture to increase harvests

Computers and Technology
1 answer:
BigorU [14]3 years ago
3 0
Tractors,water works, plows, water in general
You might be interested in
A workstation’s user prefers KDE over GNOME. Which login manager can this user run to ensure direct login to KDE?
Mice21 [21]

Answer:

B. KDM

Explanation:

The KDE display manager (KDM) was developed for the KDE desktop environment, while the GDM is a display manager for the gnome desktop environment.

The XDM display manager is used by the Linux operating system when a specific desktop environment is not chosen.

3 0
4 years ago
Pleaseee helpppppppppp
zloy xaker [14]

Answer:

EXAMPLE -

Create a variable and assign your age

var myage = 32;

type your age:

console.log(my age) ;

Notice that we did not type the actual numeric age. We used the variable instead. There wouldn’t be any purpose of declaring a variable if we were going to type 32 directly.

This makes the scrip more portable which means that the result on the screen is independent of the code console.log(myAge); . If we need to change our age all we have to do is to assign another number to the variable myAge and the output will change automatically. That’s the purpose of a variable.

5 0
3 years ago
A window may be resized by dragging the___ or side of it
dangina [55]

top i believe is the answer


4 0
4 years ago
Read 2 more answers
_________ is the biggest problem you can face if you don’t identify the scope of your risk management project. Scope creep Nonco
mart [117]

Answer: Scope creep

Explanation:

 Scope creep in the project management basically refers to the uncontrolled development or growth in the project creep. It basically occur when the project scope are not appropriately defined.

It usually involve lack of change in the control system and increase the complexity of the project. It is also has poor requirement analysis.

So, that is why it is the biggest problem we usually face in the project management.

5 0
3 years ago
30points!!!! Plz answer quickly
stich3 [128]

Answer:

center

Explanation:

that is the focal point

3 0
3 years ago
Read 2 more answers
Other questions:
  • Consider the partially-filled array named a. What does the following loop do? (cin is a Scanner object)
    12·1 answer
  • The Windows ____ window allows you to create the graphical user interface for your application.
    9·1 answer
  • Which process best describes how you might prepare to apply for a job?
    10·2 answers
  • How to do this PLEASE HELP 80 points!
    15·1 answer
  • Which similar computer network components connect multiple devices?
    11·2 answers
  • Name the part of windows<br> explore window​
    7·2 answers
  • Realizaţi un eseu cu titlul Extinderea domeniului de măsurare la ampermetre
    15·1 answer
  • Provide a class Letter for authoring a simple letter. In the constructor, supply the names of the sender and the recipient: def
    11·1 answer
  • Write a Python function that join the two string and print it ​
    14·2 answers
  • How to hack a I'd Indian brainly bot​
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!