1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Molodets [167]
3 years ago
5

One ninth divided into nine sixths equal what and reduce to lowest term

Mathematics
2 answers:
gulaghasi [49]3 years ago
7 0
\frac{ \frac{1}{9} }{ \frac{9}{6} } 

You transform it to a multiplication by multiplying the first term (in this case 1/9) by the inverse of the second term (which is in this case 9/6, his inverse is 6/9)
so we get 
\frac{1}{9}* \frac{6}{9} 
 \frac{6}{81}
then you divide each number by 3, So we get
\frac{2}{27}
Hope this Helps :)
erica [24]3 years ago
5 0
\rm \frac{ \frac{1}{9}}{ \frac{9}{6} }= \frac{1}{9}* \frac{6}{9}= \frac{6}{81}^{(3}=\boxed{\rm\frac{2}{27} }
You might be interested in
the distance between Johannesburg and bloemfontein is estimated at 435km. if they travel at an average speed of 120km per hour,h
rjkz [21]

Answer:

3.625h,217.5min,13050sec

Step-by-step explanation:

S=vt

t=S/v

t=435/120 (km) /(km/h) =3.625h

t= 3.625*60 min = 217.5 min

t=217.5*60sec = 13050 sec

8 0
3 years ago
Read 2 more answers
Write one and twenty three hundredths as a percent as a decimal and as a fraction
konstantin123 [22]
I think its 1.023 or 1 23/100
8 0
3 years ago
Read 2 more answers
What is the value for x (5x+15) (3x-3)
torisob [31]
Answer: 15x2(power)+30x-45

this problem can only be simplifyed.
I hope this helps you! have a great day!
5 0
4 years ago
Read 2 more answers
A 18 -person road crew is scheduled to finish repairing a highway in 10 days. On the morning of the fifth day, several workers o
Pavlova-9 [17]

Answer:

<u>9 workers finished the repairs, therefore 9 members of the original crew were removed. </u>

Step-by-step explanation:

1. Let's review the information given to us to answer the question correctly:

Original crew scheduled to finish repairing a highway = 18 person

Number of days remaining to finish the work = 10 - 4 = 6 days

Number of days that the rest of the crew finished the repairs = 12 days

2. How many workers were removed from the crew?

We will use Inverse Rule of Three to answer this question because the less workers the crew has the more time it will take them to finish the repairs, as follows:

Workers                Days

     18                        6

      x                        12

12x = 18 * 6 (Inverse Rule)

12x = 108

x = 108/12

x = 9

<u>9 workers finished the repairs, therefore 9 members of the original crew were removed. </u>      

3 0
3 years ago
Simplify 5(8d+ 6 <br>A. 13d + 6 <br>B.130d+ 11 <br>C.40d+ 6<br>D. 40d+ 30​
11Alexandr11 [23.1K]
The answer is 7x so Im guessing it’s either C or B
5 0
3 years ago
Other questions:
  • A cone shaped vase has a radius of 12 cm and a height of 45 cm. What is the exact value of the volume of the cone?
    14·1 answer
  • Find the difference between (15,-17) and (-20,-5)
    12·1 answer
  • I Need Help Please .... ASAP
    13·2 answers
  • the mean on a advanced algebra test was 78 with a standard deviation of 8. if the test scores are normal distributed, find the i
    15·1 answer
  • Type the correct answer in each box. Use numerals instead of words. If necessary, use / for the fraction bar(s).
    12·1 answer
  • Writing an equation in Point-Slope Form
    12·2 answers
  • You work 4 hours on Saturday and 7 hours on Sunday. You also receive a $35 bonus. If your paycheck was for $142.25, how much do
    14·1 answer
  • The table represents a linear function. The rate of change between the points (–5, 10) and (–4, 5) is –5. What is the rate of ch
    8·2 answers
  • Which expression represents 12 more than the product of a number and 7
    11·2 answers
  • PLS HELP NEED THIS IN AN HOUR PLS NO LINKS
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!