Answer:
C) 1
F) 29
Step-by-step explanation:
all numbers less than 30 are solutions
0.83333 and the 3 repeating would be 5/6 as a repaeating decimal remember it goes on and on.
Answer:
it is either 300 or 10 hope this helps please mark brainliest
Step-by-step explanation:
IF the estimates are 100% accurate, then the maximum volume of concrete is the product of the maximum dimensions, namely
Vmax=18.32*12.22*0.55=123.13 m^3
and the minimum volume of concrete is the product of the minimum dimensions
Vmin=18.28*12.18*0.45=100.19 m^3
the uncertainty is therefore 123.13-100.19=22.94 m^3
On the practical side, to this uncertainty must be added to
- squareness of the formwork
- evenness of the surface of the crushed stones on which the foundation sits on
- excess of concrete delivered by the truck
- volume of air bubbles trapped in the the concrete, ...