The answer is to the problem is 2
Answer:
its 5 + 4 = 9, then add x + y to get 20
Step-by-step explanation:
ez points IMAO
1/10 of the thread is left because a connected to b is the thread and minus the 1/5 is 1/10 since 1/3 +total thread to begin wit.
<u>If you are talking about Great White Sharks, then here is what you need:</u>
Length: Female: 4.5 – 6.4 m (Adult), Male: 3.4 – 4.1 m (Adult)
Mass: 520 – 1,100 kg (Adult)
<h2><em><u>
(The measurements may vary)</u></em></h2>
According to the information given, the system of inequalities that models the situation is given by:
<h3>System of inequalities:</h3>
For the system, the variables are:
- x is the number of hours that Pump 1 runs.
- y is the number of hours that Pump 2 runs.
They will run for at least 18 hours in a day but obviously no more than 24 hours in a day, hence:


Pump 1 can move 120 gallons per hour while Pump 2 can move 200 gallons per hour. In total the two pumps must move at least 3,000 gallons of water per day, hence:

You can learn more about system of inequalities at brainly.com/question/14361489