1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
ser-zykov [4K]
3 years ago
9

A user complains that Skype drops her videoconference calls and she must reconnect. At which layer of the OSI model should you b

egin troubleshooting?
Computers and Technology
1 answer:
umka2103 [35]3 years ago
4 0

Answer: Application layer

Explanation:

Application layer of OSI(Open system interconnection) that is responsible for interfacing the communication with the user by displaying information or message. It maintains the transmission of file and assessment, emailing faculty, using network services etc.

  • According to the question,if any Skype user has complain regarding video call drop while conferencing then application is responsible to solve the issue.
  • This layer will be the starting point of troubleshoot by approaching to network resources.As call drop can occur due to network service, congestion or resource issue.
You might be interested in
Give a real life of an if statement
bogdanovich [222]

Answer:

If Joe wants to eat an apple then he eats an apple.

Explanation:

The if statement checks if Joe "wants to eat an apple", if it turns out he does not then nothing will happen.

7 0
3 years ago
Applications of kinematics in computer engineering​
uysha [10]

Answer:

There is a wide application of kinematics; it is also used in astrophysics. In mechanical engineering, robotics, and biomechanics, it is used to describe the motion of the system of the joint parts.

6 0
3 years ago
Generally speaking, manufacturing overhead is applied to production by means of a __________ __________ __________, which is com
Mkey [24]

Answer: Predetermined Overhead Rate, Estimated Manufacturing Overhead and Annual Activity Level.

Explanation:

Generally speaking, manufacturing overhead is applied to production by means of a predetermined overhead rate, which is computed under the general formula of dividing estimated overhead rate by some measure of the annual activity level.

A predetermined overhead rate is usually calculated at the beginning of an accounting period. It is calculated by dividing the estimated manufacturing overhead by an activity driver (e.g machine hours).

5 0
4 years ago
Read 2 more answers
Some Tiny College staff employees are information technology (IT) personnel.
const2013 [10]
xndnxbxnndndndnndnxndnnxndndnndndndnndndndndndnndnxnx
5 0
3 years ago
Why did it take fewer 1-inch tiles than 1-centimeter tiles to measure the length of the cookie cutter?​
Romashka-Z-Leto [24]

The inch tiles are larger, meaning they use less space.

6 0
3 years ago
Other questions:
  • How much does a Canon PowerShot G7X cost in America?
    14·1 answer
  • The Active Directory Users and Computers tool can be used to:______.
    11·1 answer
  • Convert 15 from decimal to binary. Show your work.
    14·1 answer
  • If you wanted to share a statement of the company's financial position at a certain time, you would use a _____.
    12·2 answers
  • The function below takes a single argument: data_list, a list containing a mix of strings and numbers. The function tries to use
    6·1 answer
  • The type of medium used to hide data in steganography is referred to as __________. This may be a photo, video, sound file, or V
    12·2 answers
  • In a swap you need a variable so that one of the values is not lost ? Need help
    7·2 answers
  • What are some applications of computer in public administration?​
    8·1 answer
  • Where are 'if' and 'else' statements shown when printing a document in a word processor?
    8·1 answer
  • When dividing it’s total debt by total equity what’s a company trying to measure
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!