I believe you meant "why is the number of shifts multiplied by approximately 4.5 to obtain the total number of operators required to run the plant"
Answer and Explanation:
There are 3 shifts per day, 49 weeks per year and 5 shifts per operator per week
To get total number of operators required to run the plant, we multiply number of shifts in a year by number if operators per shift.
49 weeks×5 shifts= 245 shifts per operator per year
365×3 shifts= 1095 shifts per year
1095/245=4.5 operators per shift
total number of operators required to run the plant(per day) = 4.5×3= 13.5 approximately 14
total number of operators required to run the plant(per year) =4.5×1095=4927.5 approximately 4928
Step-by-step explanation:
<h2>Answer:-</h2>

First, we need to add up the x.
We know that 4+8 = 12, so

Now, equating it to y,

Now, if I multiply
on both sides,
I get,
Now, as 12 got cancelled , I got the final answer as
Hope it helps :)
Answer:
12
Step-by-step explanation:
-2f-3=7
+2f-3=7+2
f-3=9
f+3=9+3
f=12
i think
Step-by-step explanation:
you collect like terms from both sides that is, the variables on one side and the constants on the other side