Answer:
11 persons chosen to participate in the survey
Step-by-step explanation:
A certain fraction or percentage of subjects or persons drawn randomly from a larger population is called a sample. A randomly selected set of sample will be representative of the population especially when it is impossible for the whole population to participate in the study. In the scenario above, the population or larger group would be the set of volunteers. The actual number of people chosen from the group of volunteers to participate in the survey is the sample, which are the 11 people chosen from the volunteers.
Step-by-step explanation:
after 4 hours, the water level decreased by 8 feet
which is -8
Therefore -8/4 = -2 change in water level every hour
Answer:
True
Step-by-step explanation:
The variable overhead rate variance refers to the difference in two variables.
The Variables are
1. The actual variable manufacturing overhead
2. The expected variable overhead given the number of hours worked
Labor rate variance is evaluated by
AH(AR - SR)
AH = actual hours
AR = actual rate
SR = standard rate.
The variable overhead rate variance is also calculated the same way except that it replaces the direct labor rates with variable overhead rates
Answer:
1.627 miles
Step-by-step explanation:
longest distance - 2.55 miles
shortest distance - 0.923 miles
difference = 2.55-0.923
=1.627 miles