1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
olganol [36]
2 years ago
7

When a figure is translated on a coordinate grid, what conclusion can you draw from the pre-image and image?

Mathematics
1 answer:
Gennadij [26K]2 years ago
7 0
When a point or figure on a coordinate plane is moved by sliding it to the right or left or up or down, the movement is called a translation. The figure is translated from one position to another.

Emphasize the basic properties of translations:

<span>
</span><span>1. Lines are taken to lines, and line segments to line segments of the same length (this property states that choice C is incorrect).</span><span />
<span>
</span><span>2. Angles are taken to angles of the same measure.</span><span />
<span>
</span><span>3. Parallel lines are taken to parallel lines and orientation of the figure remains the same (this property states that choice B is incorrect).
</span><span>
</span><span />4. The image of a figure under a translation is always congruent to the preimage (this property states that choice A is incorrect).

Answer: correct choice is D (prove that using property 1 and definition of translation).
You might be interested in
there is a line includes the point (0,4) and has a slope of 7 what is its equation in slope-intercept form
Oliga [24]

Answer:

y=7x+4

Step-by-step explanation:

slope- intercept form is y=mx+c

m=7

so y=7x+c

substitute (0,4) into y=7x+c

so 4=(7x0)+c

c=4

so y=7x+4

3 0
3 years ago
The Robotics Manufacturing Company operates an equipment repair business where emergency jobs arrive randomly at the rate of thr
cluponka [151]

Answer:

The correct answer is:

  • \lambda=0.375 \ jobs \ per \ hour
  • \mu=0.5 \ jobs \ per \ hour

Step-by-step explanation:

The given values are:

Service time varies,

Repair time = 2 hours

Standard deviation = 1.5 hours

Robotics uses per hour cost,

= $35

Company's cost per hour,

= $28

(a)

⇒ Arrival rate = Jobs per hours

then,

                       = \frac{8 \ hours}{3 \ jobs}

                       = 2.666 \ hours \ per \ job

The jobs per hour will be:

⇒  \lambda=\frac{1}{2.666}

       =0.375

(b)

⇒ Service rate = jobs per hour

then,

                      μ = \frac{1 \ repair \ job}{2 \ hours}

                         = 0.5 \ jobs

7 0
3 years ago
A red candle is 8 inches tall and burns at a rate of 7/10 inch per hour. a blue cans is 6 inches tall and burns at a rate of 1/5
Galina-37 [17]
Let t = number of hours

The first candle starts at 8 inches.
It burns at 7/10 inch per hour, so in t hours it burns (7/10)t inches.
After t hours, its length is 8 - (7/10)t

The second candle starts at 6 inches.
It burns at 1/5 inch per hour, so in t hours it burns (1/5)t inches.
After t hours, its length is 6 - (1/5)t

You want the lengths to be equal, so the equation is

8 - (7/10)t = 6 - (1/5)t
4 0
3 years ago
Suppose a subset of eight different days of the year is selected at random. What is the probability that each day is from a diff
goldfiish [28.3K]

Answer:

P = 0.05

Step-by-step explanation:

12 months * 30 days each = 360 days

From 306 days, we have to select 8 days = 360C8 ways(Total ways)

We want each days from different month. First, we have to select 8 month from 12 month = 12C8 ways

---By selecting 8 month, we will select a days from each month. That can be done in = 30C1 * 30C1 * .................30C1 (8 ways) [From a month with 30 days, we can select a day in 30C1 ways = 30 ways]

Therefore P = Number of ways of selecting each days from different month / Total number of ways

P = 12C8 * 30^8 / 360C8

P = 495 * 656100000000 / 6469697679132645

P = 0.0501985588982791

P = 0.05

Hence the probability that each day is from a different month is 0.05

6 0
3 years ago
Plz help due tommorow big grade
Korvikt [17]
It would take 4750 because 1L is 5000 ml and 5000-250=4750. Use the web to do it in metric measurements.
3 0
3 years ago
Other questions:
  • Choose the correct conic section to match the equation. y 2 = 36x<br> I need help
    5·2 answers
  • The density of a certain material is such that it weighs 7 pounds for every 5.5 cups of volume. Express this density in kilogram
    15·1 answer
  • Kelly has 4 times as many songs on her music
    14·1 answer
  • 15/2...7<br> if the three dots is one number what are all possibel numbers?
    9·1 answer
  • Find the missing side or angle.
    11·1 answer
  • The value of y is directly proportional to x.
    6·1 answer
  • Write the equation of the line in fully simplified slope-intercept form.
    5·1 answer
  • Only 4 b and c please
    11·1 answer
  • Drag the operation signs to make the equation true. An operation may be used once. more than once, or not at all
    5·1 answer
  • Please help!! I will give 20 points to the correct answer !! Thanks so much
    13·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!