Shtirlitz [24]
4 years ago
7

A PERT project has 45 activities, 19 of which are on the critical path. The estimated time for the critical path is 120 days. Th

e sum of all activity variances is 64, while the sum of variances along the critical path is 36. What is the probability that the project can be completed between days 108 and 120?A) 0.0227B) 0.1058C) minus−2.00D) 0.9773E) 0.4773
Mathematics
2 answers:
Anuta_ua [19.1K]4 years ago
7 0

Answer:

0.4773

Step-by-step explanation:

The estimated time for the critical path, μ = 120 days

Sum of variances along the critical path = 36

Standard deviation of critical path δ, is therefore given as,

δ = \sqrt{36}

δ = 6

1. Probability that the project can be completed between 108 and 120 days:

Z = days range / standard deviation

Z = (108 - 120) / 6

= - 2

Therefore, the probability that the project can be completed in less than 108 days = 0.0227 or 2.27%

Since the critical path is attained at half the time that it takes to complete the project,

Probability that the project duration is between 108 and 120 days = Probability at critical time - Probability when the duration is less than 108 days

P = 50% - 2.27%

= 47.73% or 0.4773

AleksandrR [38]4 years ago
6 0

Answer:

P ( 108 < X < 120 ) = P ( -2 < Z < 0 ) = 0.4773

Option E

Step-by-step explanation:

Given:

- The estimated time for critical path u = 120 days

- The sum of variances along critical path Var = 36

Find:

What is the probability that the project can be completed between days 108 and 120?

Solution:

- The project always takes route of the critical path activities, hecne, we will ignore the activities that are not on critical path.

- We assume that the probability of completion time is normally distributed.

Normal probability distribution has two parameters- average and standard deviation.

- We will assign a random variable X as the number of days to complete activities on critical path. So,

                            X~ N ( 120 , sqrt(36) )

- We need to find the probability, compute the corresponding Z-scores:

      P ( 108 < X < 120 ) = P ( (108 - 120)/ 6 < Z < 0 )

- Use the Z-Tables to look up the required probability:

     P ( -2 < Z < 0 ) = 0.4773

Hence,

      P ( 108 < X < 120 ) = P ( -2 < Z < 0 ) = 0.4773

You might be interested in
The difference of 9x and 8x is 107
soldi70 [24.7K]

Answer:

9x-8x=107

x=107

Step-by-step explanation:

explanation is in image below

7 0
3 years ago
Please please please someone help me
fredd [130]
96 sq units and 460 pi cm2
6 0
4 years ago
Which statement is true? I am giving a lot of points away for this so please provide the correct answer and an explanation.
ikadub [295]

Answer:

the second option from the top

7 0
3 years ago
Read 2 more answers
find the lenght of the poster board is 2 feet and the width is 1 whats the serea of the board of the poster
rusak2 [61]
2 square feet is the answer


8 0
3 years ago
What is the surface area?
OverLord2011 [107]
First find the area of two sides (Length*Height)*2 sides, 70. Then find the area of adjacent sides (Width*Height)*2 sides, 60.9. And then find the area of ends (Length*Width)*2 ends, 87. Lastly add the three areas together to find the surface area, 217.9.
7 0
3 years ago
Other questions:
  • Which set is a subset of every set?
    9·1 answer
  • A map scale reads 2 inches = 25 miles which distance does 6 inches represent
    10·2 answers
  • Brainlieat.
    9·1 answer
  • What is pi rounded to the nearest 15th
    15·1 answer
  • When can a probability tree diagram be useful?
    14·2 answers
  • Can i have help please? it would be really nice!
    15·1 answer
  • Select the correct solution set.<br> X + 17&lt;3<br> {XiXS-20)<br> O(xix14)<br> O xX2-20)
    5·1 answer
  • Will give brainliest need a quick answer
    14·1 answer
  • The length of the minute hand on a clock<br> is 8 in . what is the circumference?<br><br>​
    14·1 answer
  • How the heck do you do the onion skin math method?
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!