Answer:
D
Explanation:
D because you have to keep up with demand
Answer:
With the correcting entry method, the wrongly posted account will transfer the amount that was to be posted elsewhere to the place it was to be posted in. In this case the posting was to be to Accounts Receivable not Service fees so:
Date Account Title Debit Credit
May 23 Service Fees $1,270
Accounts Receivable $1,270
Answer:
Manufacturing overhead cost applied= $280,720
Explanation:
Giving the following information:
Plantwide predetermined overhead rate of $23.20 per direct labor-hour.
Estimated $278,400 of total manufacturing overhead cost.
Estimated activity level of 12,000 direct labor-hours.
The company incurred actual total manufacturing overhead costs of $269,000 and 12,100 total direct labor-hours during the period.
Manufacturing overhead cost applied= actual direct labor hours* predetermined overhead rate
Manufacturing overhead cost applied= 12100* 23.20= $280,720
Answer:
Net cash flow from operating activities $1,700
Explanation:
The preparation of the reconciliation of net income to net cash flows from operating activities is shown below:
Net loss -$5,000
Add: Depreciation expense 6,000
Add: Increase in salaries payable 500
Add: Decrease in accounts receivable 2,000
Less; Increase in inventory 2,300
Add; Amortization of patent 300
Add; Reduction in discount on bonds 200
Net cash flow from operating activities $1,700
Part 1.1 - Variable overhead cost incurred to fill the order for the 120,000 items is $7,800.
Part 1.2 - Difference between standard and actual variable overhead cost is $440.
Part 3
- Difference between standard and actual variable overhead cost is $440.
<u>Explanation:</u>
It is given that the number of order is 120,000 items and calculated standard variable overhead cost per order for one item is $0.065. Variable overhead cost incurred to fill the order for the 120,000 items can be calculated by multiplying the number of order of the items with the calculated standard variable overhead cost per order for one item. Hence, the variable overhead cost incurred to fill the order for the 120,000 items is $7,800.
It is given that the actual variable overhead cost is $7,360 and calculated standard variable overhead cost is $7,800. Difference in standard and actual variable overhead cost can be calculated by deducting the actual variable overhead cost from the standard variable overhead cost. Hence, the difference between standard and actual variable overhead cost is $440.
Calculated variable overhead rate variance is $115 favorable and the variable overhead efficiency variance is $325 favorable. Difference between standard and actual variable overhead cost is the total of variable overhead rate variance and variable overhead efficiency variance. Hence, the difference between standard and actual variable overhead cost is $440.