1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Andrews [41]
3 years ago
15

For the following linear equations, determine which inverse operation allows you to determine the solution of the equation. In y

our final answer, also include the solution to each equation.
1) n/5 = -0.3
2) -2n = 4 1/3
Mathematics
1 answer:
VARVARA [1.3K]3 years ago
3 0

Answer:

see explanation

Step-by-step explanation:

(1)

Given

\frac{n}{5} = - 0.3

Since n is divided by 5 then use the inverse operation, multiplication.

Multiply both sides by 5 to clear the fraction

n = 5 × - 0.3 = - 1.5

(2)

Given

- 2n = 4 \frac{1}{3} ← change to an improper fraction

- 2n = \frac{13}{3}

Since n is multiplied by - 2 then use the inverse operation, division.

Divide both sides by - 2

n = \frac{13}{-6} = - \frac{13}{6}

You might be interested in
If f(1) = 1 and f(n) = -3f(n-1) then find the value of f(5).
baherus [9]

Answer:

f(5)=-12

Step-by-step explanation:

f(5)=-3*f(5-1)

f(5)=-3*(4)

f(5)=-12

Hope this helps

8 0
3 years ago
Read 2 more answers
In how many ways can you write 3:4 as a fraction
Pie
3/4 as a fraction to 9/12
4 0
3 years ago
The total cost for a production process is equal to $1,000 plus two times the number of units produced. The mean and variance fo
Andrej [43]

Answer:

\mu_p=2000\\\\\sigma_p^2=3600

Step-by-step explanation:

Let X be the number of units produced, and P be the cost of production.

#Given that \mu_x=500, \sigma_x^2=900

Cost of production can be calculated as:

P=1000+2X

#Mean of the total cost is calculated as;

\mu_p=1000+2\mu_x\\\\=1000+2(500)\\\\=2000

Hence, the mean cost of production is $2,000

#Variance of the total cost is calculated as;

\sigma_p^2=2^2\sigma_x^2\\\\=2^\times 900\\\\=3600

Hence, the variancecost of production is $3,600

8 0
3 years ago
Can someone help me? I don’t really understand how to do this m
Artemon [7]

Answer:

probably about 59 degrees

Step-by-step explanation:

4 0
4 years ago
Read 2 more answers
Using the slope formula, find the slope of the line through the given points (2,7) and (5,1)
Zanzabum

Answer:

The slope is -2.

Step-by-step explanation:

The slope formula is (y1-y2)/(x1-x2)

or change in y / change in x.

First, you plug in your numbers. I will use (2, 7) as (x1, y1)

(1-7)/(5-2)

Next, simplify.

(-6)/(3)

or

-2

And that's your slope!

6 0
4 years ago
Other questions:
  • Explain this to me plz
    10·2 answers
  • What are the answers to these i put them in the picture
    7·1 answer
  • Kathy wants to paint two walls
    8·1 answer
  • Which is the best way to solve the equation x2 = n?
    8·1 answer
  • Ace's brother is 9 years older than three times his age. the sum of their ages is 57 .how old is Chris?
    10·1 answer
  • (5+5i)(5-5i)=what????
    12·2 answers
  • What is the ratio for 4, 8, 12, 14 (r)
    6·1 answer
  • What is the probability of flipping tails and rolling a three?<br> This includes a quarter and dice.
    13·1 answer
  • Jessica and her 2 sisters want to take a camping trip. They have $225 saved so far. Each of them will save $21 a week until they
    15·1 answer
  • Please help me ASAP! Will give Brainliest + lots of points!!
    11·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!