The answer to this question using the quadratic formula is x= -1+3√5/2 and x=-1-3<span>√5/2
</span>that is a square root, or, 3 times the square root of 5 ALL over 2, except for the 1. Same with the other one.
To find the inverse of a relation, we switch the x and y values in each point.
So the inverse would be {(4, -3), (0, -1), (0, 6).
Answer:
62/3 is the answer
hope this helps! :)
Step-by-step explanation:
Yes, I'm getting C also!
Since it's asking for the left-endpoint Riemann Sum, you will only be using the top left point as the height for each of your four boxes, making -1, -2.5, -1.5, and -0.5 your heights. The bases are all the same length of 2. You don't include f(8) because you're not using right-endpoints, and that would also add another 5th box that isn't included in the 0 to 8 range.
Answer:
0.1151 = 11.51% probability of completing the project over 20 days.
Step-by-step explanation:
Normal Probability Distribution
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Expected completion time of the project = 22 days.
Variance of project completion time = 2.77
This means that 
What is the probability of completing the project over 20 days?
This is the p-value of Z when X = 20, so:



has a p-value of 0.1151.
0.1151 = 11.51% probability of completing the project over 20 days.