The answer is 2.6 m/s
The speed (v) is distance (d) through time (t).
v = d/t
We know:
d = 390 m
t = 150 s
v = d/t
v = 390 m / 150s
v = = 2.6 m/s
we know that Bob can do the whole job in 14 hours, how much of the work has he done in 1 hour only? well since he can do the whole lot in 14 hours in 1 hour he has only done 1/14 th of the job.
we know that James can do it in 18 hours, a bit slower, so in 1 hour he has done only 1/18 th of the job.
let's say it takes both of them working together say "t" hours, so in 1 hour Bob has done (1/14) of the work whilst James has done (1/18) of the work, the whole work being t/t or 1 whole, so for just one hour that'd 1/t done by both Bob and James.

Answer:
The coordinates of P' are (4.8,-4.8).
Step-by-step explanation:
The rule of dilation
represent the dilation with scale factor 2.4 and center at origin.
If the scale factor of the dilation is k and the center is (0,0), then

Since the scale factor is 2.4, therefore

From the given figure it is noticed that the coordinates of P are (2,-2). The coordinates of P' are


Therefore the coordinates of P' are (4.8,-4.8).
525cm bro because i just took it right now
Answer:
Step-by-step explanation:
Allow me to rewrite your question and hope it will fit the original one:
<em>Jackson recorded the growth of a plant over 10 weeks. The equation </em><em>y=0.25x+4</em><em> represents the height y in inches over time x in weeks what does the y intercept represent In terms of the situation</em>
My answer:
As we know that y intercept is the value of y at the point where the line crosses the y axis (the value of x =0)
So in this situation, if x= 0, it means the height of the tree (y-intercept) initially be at 4 at week 0.
Hope it will find you well.