Answer:
Upgrade refers to upgrading to a new version from old version
Clean Install: Removing old version completely and install from scratch
Explanation:
Let you want to upgrade windows server 2008 to windows server 2016.There are 2 options
1. you can directly migrate windows server 2008 to 2016 by keeping everything as it is , so all the data and applications on the system remains as it is and only OS will upgrade.
2. uninstall everything and clean install windows server 2016.Here all previous applications and data are erased
In the above case if all applications on the system are compatible with windows server 2016 from 2008 we can go for upgrade directly otherwise it is better to go with clean install as we need different version of application which is compatible with windows server 2016
The type of activities that are ideal for a robot to perform are; Repetitive tasks
Robots are machines that are programmable by a computer which have the capacity of automatically carrying out a complex series of actions.
Now, robots are used in a wide array of industries which include manufacturing, assembly and packaging, transport, earth and space exploration, e.t.c.
The most common use are found primarily in the automobile industry where they are used to carry out repetitive tasks and those that are difficult or hazardous for humans.
Read more about robots at; brainly.com/question/9145476
CPU (Central Processing Unit) is also known as the brain of the computer because this is the place which actually runs the programs. The programs are the set of instructions needed to perform a task.
i believe some are google docs, apple icloud, xdrive, MediaMax, and Strongspace
The engineering design process important to the customer layout system permits things: A shared technique on a way to discover and remedy problems. A framework to assess ideas, tell priorities and save you myopic paintings.
<h3>What is the maximum vital step withinside the engineering layout system?</h3>
The first step withinside the engineering layout system is to outline the trouble that you are solving. This step is the maximum vital, as a defective know-how of the trouble handy ends in layout failures. Engineers paintings to discover the foundation trouble via way of means of opposite engineering the signs and symptoms they perceive.
The engineering layout system, via way of means of definition, is a sequence of steps that engineers use to discover an option to a trouble. These steps include: defining the trouble, brainstorming solutions, designing and constructing a prototype of the solution, trying out the solution, and enhancing it.
Read more bout the engineering :
brainly.com/question/17169621
#SPJ1