I’m not understanding .. is there a picture ?
Answer:
Follows are the instructions to this question:
Explanation:
Given:
Configuration of machine =
Machine hours=
Order on Packing= 
We have to use the following formula in order to measure the expected production overhead rate:
Estimated overhead production rate= Total projected production expenses and for period/Total base allocation sum
Machine Configuration
Machining hour=
Packing
Answer:
β = 1.45
Explanation:
The beta of the portfolio is defined as an average of the betas (β) of each asset within the portfolio weighted by their respective invested amounts (A):

The beta of the portfolio is 1.45