Answer:
Option B
Step-by-step explanation:
<u>Option A
</u>
In order to make a triangle: a + b > c and b + c > a and c + a > b
2 is a, 6 is b, and 1 is c
a + b > c
2 + 6 > 1
8 > 1 -> <em>TRUE
</em>
b + c > a
6 + 1 > 2
7 > 2 -><em> TRUE
</em>
c + a > b
1 + 2 > 6
3 > 6 -> <em>FALSE
</em>
<u>Option B
</u>
In order to make a triangle: a + b > c and b + c > a and c + a > b
3 is a, 3 is b, 2 is c
a + b > c
3 + 3 > 2
6 > 2 -> <em>TRUE
</em>
b + c > a
3 + 2 > 3
5 > 3 -> <em>TRUE
</em>
c + a > b
2 + 3 > 3
5 > 3 -> <em>TRUE
</em>
OPTION B IS A TRIANGLE
Option C and D are automatically incorrect because Option B is incorrect. But, the same process would go to the end.
Answer: Option B
Answer:
2⁹
Step-by-step explanation:
Using the rule of Indices:
aⁿ x aˣ = aⁿ⁺ˣ
Hence: 2²⁺³⁺⁴
= 2⁹
The volume is 300 inches cubed, first I split the figure into three, the volume=L×W×H, for the first box I did 4×4×5=80, the second box I did 6×6×5=180, the third box I did 2×4×5=40, therefore 80+180+40=300
therefore the answer being 300 inches cubed
Create a stem-and-leaf plot of the data values 72,44,75,57,81,65,68,72,73,84,91,76,83,88.
n200080 [17]
To solve this problem you must apply the problem you must apply the proccedure shown below:
1. You have the following data values given in the problem above:
<span>72,44,75,57,81,65,68,72,73,84,91,76,83,88.
2. To create a stem and leaf plot, you must order the digits in the following way:
- The first digits must be listed in the colum "Stem".
- The second digit must be listed in the colum "Leaf".
- Then, write the key, which is the meaning of the data ploted (4|4 means 44).
The S</span>
tem and leaf plot is shown in the figure attached.