The significant event at the conclusion of each phase is called a milestone.
- A milestone in your life is an important occasion. A turning point frequently ushers in a fresh chapter. For instance, your high school graduation was a significant event in your life. A roadside signpost that indicates the distance to a specific point is referred to as a milestone.
- Birthdays celebrated at milestone ages are those extra-special ages that call for more than simply a card and cake. Important childhood milestones that typically require a sizable party and an especially thoughtful present include a first birthday and turning 13 years old.
- A crucial moment or stage in the existence, development, or similar of a person, a country, etc. Her career reached a turning point when she was hired as a supervisor.
Thus this is the answer.
To learn more about milestone in life, refer:brainly.com/question/25605883
#SPJ4
school or expirence and the knowledge to do it and th ejob right
I think the answer is convergent plate boundaries, but I am not positive. hope this helps :)
Answer:
the present value of its growth opportunities (PVGO) is $0.56
Explanation:
The computation of the present value of growth opportunities is shown below:
= Price per share - (Earnings ÷ required rate of return)
= $41 - ($3.64 ÷ 9%)
= $41 - $40.44
= $0.56
hence, the present value of its growth opportunities (PVGO) is $0.56
We simply applied the above formula so that the correct value could come
And, the same is to be considered
Answer:
Cost per unit under variable costing $
Direct material 110
Direct labour 150
Variable manufacturing overhead <u> 75 </u>
Cost per unit <u>335 </u>
<u />
Cost per unit under absorption costing $
Direct material 110
Direct labour 150
Variable manufacturing overhead 75
Fixed manufacturing overhead ($2,700,000/90,000) <u>30</u>
Cost per unit <u>365</u>
Explanation:
In variable costing, cost per unit is calculated by the addition of all variable costs while in absorption costing, fixed manufacturing overhead application rate is added to the variable costs in order to obtain the cost per unit.