1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Natasha2012 [34]
3 years ago
14

What does lurch mean

Computers and Technology
2 answers:
o-na [289]3 years ago
7 0

Answer:

lurch means make an abrupt, unsteady, uncontrolled movement or series of movements; stagger.

vitfil [10]3 years ago
3 0

Answer:

uncontrolled movement or series of movements

Explanation:

You might be interested in
Preliminaries
Ratling [72]

Answer:

okahsb

Explanation:

8 0
3 years ago
Int[] myArray1= new int[24]; int[] myArray2= new int[10]; float[] myArray3= new float[8]; int index1, index =0 for(int index1 =0
anastassius [24]

Answer:

The value of myArray2[index2] when index1 = 12 is 30

Explanation:

In the source code, the formula for myArray2[index2] is;

   myArray2[index2] = index2 + index3 + myArray1[index1],

   myArray1[index1] = index1 * 2,

   index2 = index % 10 (equal to the remainder) and

   index3  = index % 8

When index1 increases to 12 in the for-loop statement, the "myArray1[index1]" is equal to 24, index2 is equal to 2 and index3 is 4. The total sum is equal to 30 and assigned to "myArray2[index2]".

3 0
3 years ago
Each symbol of an octal number corresponds to 3 bits of a binary number. is it true or false​
grin007 [14]

Answer: True.

Explanation: It uses only the 3 bits to represent any digit in binary and easy to convert from octal to binary and then to vice-versa. Hope that helps

5 0
3 years ago
_________ is the biggest problem you can face if you don’t identify the scope of your risk management project. Scope creep Nonco
mart [117]

Answer: Scope creep

Explanation:

 Scope creep in the project management basically refers to the uncontrolled development or growth in the project creep. It basically occur when the project scope are not appropriately defined.

It usually involve lack of change in the control system and increase the complexity of the project. It is also has poor requirement analysis.

So, that is why it is the biggest problem we usually face in the project management.

5 0
3 years ago
A(n) _________________ data type is quite similar to the structure of a row in a database table.
VMariaS [17]
An array data type is similar to the structure of a row in a database table.
7 0
3 years ago
Other questions:
  • ________ employees state-of-the-art computer software and hardware to help people work better together.
    15·1 answer
  • What computer system was the first to run the unix operating system?
    11·1 answer
  • Which situation can result in positive population growth?
    14·1 answer
  • Which of the following scanning technique attackers use to bypass firewall rules, logging mechanism, and hide themselves as usua
    11·1 answer
  • Which of the following should you NOT do when using CSS3 properties to create text columns for an article element? a. make the c
    12·2 answers
  • During the forensic phase of a security investigation, it was discovered that an attacker was able to find private keys on a poo
    9·1 answer
  • Explain the importance of determinism in an industrial LAN
    8·1 answer
  • Which components of the​ five-component model is commonly thought of as the​ "bridge" that links the computer side of the model
    13·1 answer
  • Why do many experts recommand longer time horizonal if you are doing high risk investment
    7·1 answer
  • During the data transmission there are chances that the data bits in the frame might get corrupted. This will require the sender
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!