Answer:
It will cost $39,337.92 for the piller.
Step-by-step explanation:
Given that,
The diameter of the cylinder, d = 8 m
Height of the cylinder, h = 9 m
If concrete cost $87 per cubic meter, we need to find how much the concrete cost for the pillar.
The volume of the cylinder is given by :

Cost per cubic meter = $87
Cost for 452.16 m³ will be :
C = 452.16 × 87
C = $39,337.92
Hence, it will cost $39,337.92 for the piller.
C is right rjfjdkwjwkwwowowkkskskwwkksskkddje
To find the area multiply length times width.
43 times 36 is 1548
Take 1548 divide by 172 to get the answer.
1548/172 equals 9
Answer:
x + y = 5
3x + 3y = 15
Step-by-step explanation:
let x represent apple and y represent orange
Hence x + y = 5
and 3x + 3y = 15
Solving both equations simutaneously
From first equation, x = 5-y
Substitute x=5-y into the second equation
3(5-y)+3y = 15
y= 0
x = 5-0 = 5