true
Typically, the price charged must cover more than labor costs figured at an hourly rate. There may be costs related to rent, utilities, administration, equipment use and/or depreciation. These costs are often called overhead<span>.</span>
Answer:
0.82 m/s^2
Step-by-step explanation:
Given data
initial velocity=20m/s
Final velocity= 30m/s
Time = 12.2s
Applying the formula
a= v-u/t
a= 30-20/12.2
a= 10/12.2
a= 0.819
a=0.82 m/s^2
Answer:
1 x 1+0 x 1/10+5 x 1/100+9 x 1/1000
Step-by-step explanation:
To convert a decimal into a percentage, first we have to convert it into fractional form.
Because percentages are out of 100, the resulting fraction would be 3/100.
Next, to find the decimal, we would just divide the fraction (numerator divided by denominator).
3 % = 3/100 = 0.03
I'm pretty sure the length of the other side is 35 feet.
35+35+10+10=90