Answer:
O.Length of time you have walked and distance you have traveled.
O.Pounds of cherries you buy and amount of money you spend on cherries.
O.Number of people in a grocery check-out line and how long you have to wait to check out
Step-by-step explanation:
Please tell me this is correct and if it isn't I'm sorry if it is please mark Brainliest!
Answer:
$3.42
Step-by-step explanation:
Meters of material required = 1.2 meters
Cost per meter of material = $0.85
Direct labor hours = 0.1
Cost of direct labor per hour = $15
Overhead rate = $9 per direct labor hour
Standard cost per unit of product :
(Direct material cost per unit + direct labor cost per unit + overhead cost per unit)
Direct material cost per unit :
Material needed × cost per meter = (1.2 × $0.85) = $1.02
Direct labor cost per unit :
Direct labor hour × cost per hour = ( 0.1 × $15) = $1.5
Overhead cost:
0.1 * $9 = $0.9
Standard cost :
($1.02 + $1.5 + $0.9) = $3.42
Answer:
1140
Step-by-step explanation:
A decagon has 10 sides so substitute it like this:
(n-2) x 180
(10-2) x 180
8 x 180= 1140
? is equal to 4 because you can cancel out the 2 and the 5 from both sides and you are left with 4.