so two fellows did all the carpeting in 10 days.
now, how long did "1" fellow work only? well, it worked for 10 days.
how long did the other fellow work for? well, it was working alongside the first one, and it was there for also 10 days.
so the two guys working together, really did 10+10 = 20 "days worth of work". So that the whole carpeting job can be done in 20 "days worth of work".
now if we want to finish it in 4 days, 20 ÷ 4 = 5.
so if we hire 5 guys, since each one will do 4 days worth, 5*4 = 20 <- the whole job.
Answer:
Step-by-step explanation: yes because when rewritten in standard form the x term will still be raised to the 2nd power.
The solid 3D object that is produced by rotating the triangle about line m is a cone.
<h3>What is a triangle?</h3>
It should be noted that a triangle simply means a shape that has three sides and three angles.
In this case, the solid 3D object that is produced by rotating the triangle about line m is a cone.
Learn more about triangle on:
brainly.com/question/1058720
#SPJ1
525 feet above the ground
The answer is 5 because it would like that’s