Answer:
z(max) = 256000 Php
x₁ = 10
x₂ = 110
Step-by-step explanation:
Jogging pants design Selling Price Cost
weekly production
Design A x₁ 2500 1750
Design B x₂ 2100 1200
1. z ( function is : )
z = 2500*x₁ + 2100*x₂ to maximize
First constraint weekly production
x₁ + x₂ ≤ 120
Second constraint Budget
1750*x₁ + 1200*x₂ ≤ 150000
Then the model is
z = 2500*x₁ + 2100*x₂ to maximize
Subject to
x₁ + x₂ ≤ 120
1750*x₁ + 1200*x₂ ≤ 150000
General constraints x₁ ≥ 0 x₂ ≥ 0 both integers
First table
z x₁ x₂ s₁ s₂ cte
1 -2500 -2100 0 0 0
0 1 1 1 0 = 120
0 1750 1200 0 1 = 150000
Using AtoZmath online solver and after 6 iterations the solution is:
z(max) = 256000 Php
x₁ = 10
x₂ = 110
Answer:1
Step-by-step explanation:divided 2 by 2
Answer:https://worthstart.com/stage-names/
Here is a website that might help
Step-by-step explanation:
y = x + 4/x
replace x with -x. Do you get back the original equation after simplifying. if you do, the function is even.
replace y with -y AND x with -x. Do you get back the original equation after simplifying. If you do, the function is odd.
A function can be either even or odd but not both. Or it can be neither one.
Let's first replace x with -x
y = -x + 4/-x = -x - 4/x = -(x + 4/x)
we see that this function is not the same because the original function has been multiplied by -1
. Let's replace y with -y and x with -x
-y = -x + 4/-x
-y = -x - 4/x
-y = -(x + 4/x)
y = x + 4/x
This is the original equation so the function is odd.
Answer: Each pitcher has 4 quarts of lemonade.
Step-by-step explanation:
Louis made 24 quarts of lemonade, and he divided it equally into 6 pitchers.
Then, each pitcher must has a sixt of the total amount of lemonade, this is:
p = (1/6)*24 quarts= (24/6) quarts = 4 quarts
Each pitcher has 4 quarts of lemonade.