Answer:
the mission of the federal deposit insurance corporation is to maintain and public confidence in the nation's financial system
Answer:
To calculate the predetermine overhead rate
Explanation:
As we know that
Predetermined overhead rate = (Total estimated manufacturing overhead) ÷ (estimated direct labor-hours or estimated machine hours)
Plus if we talk about the manufacturing overhead, it is an indirect cost which could not be easy to trace the cost to a specific job or task
And the fixed cost would remain unchanged although the number of production units changes and the average cost per unit also changes due to changes in the production level
These reasons could be the greatest challenge.
Answer: variable budget
Explanation: In simple words, variable budget refers to the budget statement which shows how much different costs would vary if the level of activity as per standards set increases or decreases.
These are also called flexible budget and are made on the basis of current level of output. These budgets provides flexibility to the management with respect to both best case and worst case scenarios.
From the above we can conclude that the correct answer is variable budget.
One method on optimizing a function is by finding the absolute extrema. It is done by having the optimal values continuous including the including the endpoints. I hope my answer has come to your help. God bless and have a nice day ahead!<span>
</span>
Answer:
B. $1,639
Explanation:
To do arbitraje we will ask at Bank A for $0.305
and then bid in Bank B at $0.306
As the transactions has no cost we are doing a profit by using the exchange as they allowed. Doing this procedure will at some point eliminate the difference in exchange rate for these bank as the purchase will rise the ask rate for Bank A and the sale will decrease the bid rate.

Total: 501639,3442622951
The profit will be for: 501,639.34 - 500,000 = 1,639.34