Answer:
The combined wage bracket tables in Exhibits 9-3 and 9-4 is missing hence I will use 2014 tax year
answer :
a) Federal income tax withheld
= 75.6 + ( 1989.60 - 944 )*15% = $232.44
b) social security
6% * 1989.6 = $119.38
c) Medicare
1.45% * 1989.6 = $28.85
Explanation:
For a single individual
Two withholding allowance = $329.20 * 2 = $658.40
Gross Pay = $2648
withholding allowance = $658.40
Subject to withholding = $2648 - $658.40 = $1989.60
a) Federal income tax withheld
= 75.6 + ( 1989.60 - 944 )*15% = $232.44
b) social security
6% * 1989.6 = $119.38
c) Medicare
1.45% * 1989.6 = $28.85
Answer:
B. firms will exit the industry
Explanation:
When the firms is producing at the minimum average total cost, the amount of profit margin that they get tend to be high. This means that they can fulfill their target profit even by producing less amount of product.
Even when the demand in the market is decreased, Such firms will most likely accumulated enough profit to survive for a long period of time before they go bankrupt. This is why the firms is very unlikely to exist the industry in a short run.
Answer:
Activity Rates
Consultation $150
Drawings $58
Modeling $0.7
supervision $190
Billings $1037.5
Collections $1642.5
Total overhead allocated: $ 126,826
Explanation:
First, we divide the cost of each activity over the base total to get the rate.
![\left[\begin{array}{ccccc}$Activity&Driver&cost&Total&Rate\\$Consultation&$contact hours&315000&2100&150\\$Drawings&$desing hours&104400&1800&58\\$Modeling&$square feet&32200&46000&0.7\\$supervision&$days&228000&1200&190\\$Billings&$jobs&8300&8&1037.5\\$Collections&$jobs&13140&8&1642.5\\\end{array}\right]](https://tex.z-dn.net/?f=%5Cleft%5B%5Cbegin%7Barray%7D%7Bccccc%7D%24Activity%26Driver%26cost%26Total%26Rate%5C%5C%24Consultation%26%24contact%20hours%26315000%262100%26150%5C%5C%24Drawings%26%24desing%20hours%26104400%261800%2658%5C%5C%24Modeling%26%24square%20feet%2632200%2646000%260.7%5C%5C%24supervision%26%24days%26228000%261200%26190%5C%5C%24Billings%26%24jobs%268300%268%261037.5%5C%5C%24Collections%26%24jobs%2613140%268%261642.5%5C%5C%5Cend%7Barray%7D%5Cright%5D)
Now we apply this rate against the job activity measurement:
![\left[\begin{array}{ccccc}$Activity&Job&$Rate&$Allocated\\$Consultation&410&150&61500\\$Drawings&352&58&20416&\\$Modeling&7400&0.7&5180&\\$supervision&195&190&37050&\\$Billings&1&1037.5&1037.5&\\$Collections&1&1642.5&1642.5&\\$Total&&&126826&\\\end{array}\right]](https://tex.z-dn.net/?f=%5Cleft%5B%5Cbegin%7Barray%7D%7Bccccc%7D%24Activity%26Job%26%24Rate%26%24Allocated%5C%5C%24Consultation%26410%26150%2661500%5C%5C%24Drawings%26352%2658%2620416%26%5C%5C%24Modeling%267400%260.7%265180%26%5C%5C%24supervision%26195%26190%2637050%26%5C%5C%24Billings%261%261037.5%261037.5%26%5C%5C%24Collections%261%261642.5%261642.5%26%5C%5C%24Total%26%26%26126826%26%5C%5C%5Cend%7Barray%7D%5Cright%5D)
Answer:
True
Explanation:
Equivalent units of production need to be calculated for Materials and Conversion costs separately as the work done (Percentage Completion) towards the outputs may be different in these input elements. This is applicable to Both the <em>weighted-average method</em> and the <em>first-in first-out method</em>.