Answer:
It would take 12 men 4.5 (four and a half) days to do the same amount of work as the 9 men in 6 days.
Step-by-step explanation:
9 is 75% of 12 (12*.75=9) if they work at the same rate it would take 75% of the time it did for the 9 men (6hrs*.75=4.5)
3x+4x=2
You add 3x and 4x which gets you 7x
7x=2
You divide both sides of the equation by 7
x=2/7
This will be your result
Answer:
Raw Score
Step-by-step explanation:
A raw score is a datum point or value that has not been altered in any way. Raw scores are original measurements from surveys, tests, or other instruments that have not been weighted, transformed, or converted into any other form. Raw scores are also called observed scores.
Therefore
It is a Raw score
0.01907407 lbs per second is the answer I think
Answer:
81
Step-by-step explanation:
In order to multiply you count by the number
for example I got the answer 81 because I did
9 + 9 + 9 + 9+ 9+ 9+ 9+ 9+ 9
It's very simple all you need to do is add 9 nine times.
That is why it is the the TIMES tables.. Hope this helped!