I would divide the 18000 by 13.26 to get the number of hours needed.
18000/13.26~169.7 days with 8 hour shifts.
Answer: what is example 1
Step-by-step explanation: what is it
Answer: x = - 3.5
Step-by-step explanation:
Rewrite the equation by completing the square.
4x2 + 28x + 49 = 0
Completing the square method :
Divide through by the Coefficient of x^2
x^2 + 7x + (49/4) = 0
a = 1, b = 7, c = 49/4
Move c to the right side of the equation
x^2 + 7x = - 49/4
Complete the square on the left hand side by squaring its half of the x term
(7/2)^2 = (49/4)
Add the output to both sides of the equation
x^2 + 7x + (49/4) = - (49/4) + (49/4)
(x + 7/2)^2 = 0
Square root of both sides
x + 7/2 = 0
x = - 7/2
x = - 3.5
They would be alternate exterior so they would have to to be equal
2k + 11 = 131
-11 -11
2k = 120
---- -----
2k 2k
k = 60
Answer:
B, "The graph of g(x) will eventually exceed the graph of f(x)."
Step-by-step explanation: