The rate in m³/m² is 40m³/m².
1 m³ is literally a cube with sides that are 1 m in length. 1 m = 100 cm, so each side of this cube is 100cm in length. Finding the volume means multiplying length by width by height:
100(100)(100)=1,000,000 cm³ in 1m³.
We know that we have 25,000cm³ of mulch; we divide to find how many cubic meters this is:
1,000,000/25,000 = 40 m³.
This makes the rate 40m³/m².
Answer: There are 385 students and teachers who rode to the zoo in buses and 24 students and teachers who rode to the zoo in trains.
Step-by-step explanation:
Since we have given that
Total number of students and teachers = 409
Let the number of vans be x
Let the number of buses be x+5
Number of students and teachers each bus transported = 55
Number of students and teachers each van transported = 12
According to question,

Total number of students and teachers who rode to the zoo in buses will be

Total number of students and teachers who rode to the zoo in vans will be

Hence, there are 385 students and teachers who rode to the zoo in buses and 24 students and teachers who rode to the zoo in trains.
Answer: 5.3 Hours
Step-by-step explanation: 140 mi there at 56 mi per hour would be 2.5 hours. Then back 140 mi at 50 mi/h would be 2.8. 2.5 plus a 2.8 is 5.3 hours
Divide both sides by -5
Sqrt(x) = 3
We want to isolate x to solve for it. The opposite of a square root is a square, so square both sides.
x = 9
It can't be -9 because the square root of negative numbers are not real numbers.