AS i solve the work i quickly realized that
<span>A.5 × a number less than 1 is incorrect do to the form of the placement and how it's written and that number is not Always greater than 1
</span><span>B.4/9+ a fraction less than 12 is incorrect Cause that statement that would be there is true that it is less than were looking for greater then.
C. is correct this would be your answer. Why?
Reasoning:
1. The statmen placed on this one is true 1 & 3/4 is actually greater then 3/4 when if you just left that 1 & 3/4 with just a one it would still be greater
</span>
Answer:
0.89417
Step-by-step explanation:
Using the relation to obtain the Zscore :
Z = (x - mean) ÷ standard deviation / sqrt(n)
x = 0.8535
Mean = 0.8565
Standard deviation = 0.0518
Sample size, n = 465
P(x ≤ 0.8535) = (0.8535 - 0.8565) ÷ 0.0518/sqrt(465)
P(x ≥ 0.8535) = - 0.003 / 0.0024021
P(x ≥ 0.8535) = - 1.249
P(Z ≥ - 1.249) = 0.89417
Yes that’s correct i did this before
He has biked 2.85 miles. By multiplying 28.5 and 0.10 or dividing 28.5 by 10 you get the total 2.85. To check your answer you can multiply 2.85 by 10 which equals 28.5. Hope this helps!