Answer: Common and Preferred Stock Purchasers
Explanation:
Answer:
32
Explanation:
First bounce = 13 / 14 × 10 = 130 /14
using geometric progression where the common ratio = 13/14, the first bound = 130/14
ar^n-1 < 1
substitute the values into the equation
130 /14 × 13/14^(n-1) < 1
(13/14)^n-1 < 1÷ (130/14)
(13/14)^n-1 < 14 / 130
take log of both side
log (13 /14)^n-1 < log ( 14/130)
n-1 log (13 /14) < log ( 14/130)
since log (13/14) negative
n-1 > (log( 14/130)) ÷ ( log (13/14)
n - 1 > 30.07
n > 30.07 + 1 > 31.07
The 32 bounce will the first less than 1 foot
Answer:
The correct answer is C
Explanation:
The estimate activity duration is a procedure in project management which include the analyzing of the different activities and then estimates or approximate how long it takes for accomplishing or completing the specific task with the estimated resources.
So, the estimate activity duration is the one which comprise for computing the work periods needed for completing the activities.
Answer:
False
Explanation:
Have you ever heard the phrase "there are lies, [email protected] lies and statistics"?
The only way that a statistical study be 100% confident is that it involves everyone or everything. For example, if you want to carry on a study about how many US college students drive, in order to be 100% confident of the result, you would need to interview all the college students in the country.