Here, Just apply Distributive property which tells, a(b + c) = ab + bc
So, -6(-7 - 3k) = 42 + 18k
In short, Your Answer would be 42 +18k
Hope this helps!
Answer:
A) 2 down, 5 right
Step-by-step explanation:
hope this helpss
To solve this problem, we make use of the z statistic. The formula for the z score is:z score = (x – u) / swhere x is the sample value = 0.90, u is the sample mean = 0.917, and s is the standard deviation = 0.005
Therefore:z score = (0.90 – 0.917) / 0.005z score = -3.4
From the standard probability tables, the p-value for a right tailed test of z = -3.4 is:P = 0.9997
Therefore there is a 99.97% chance that it will be above 0.90 mm
I had this question and SAS is the correct answer