The answer for the question is 428
Answer:
$678.74
Step-by-step explanation:
989.99-311.25 = 678.74
hoped this helped
Area of triangle = 1/2 x base x height
Let the base be "b"
90 = 1/2 x 10 x b
90 = 5b
b = 18 ft
Base = 18 ft
<u>Answer:</u>
Cost of sand = £150
Cost of bricks = £157.5
Cost of cement = £134
Total cost = £441.50
<u>Step-by-step explanation:</u>
We are given that:
2 tonnes of sand is for £75.00 per tonne,
20 bags of cement are for £6.70 per bag,
350 bricks at 45p each,
So, 2 tonnes of sand at £75.00 per tonne = 2 * £75.00 = £150.00
20 bags of cement at £6.70 per bag = 20 * £6.70 = £134.00
350 bricks at 45p each = 350 * £0.45 = £157.50
Therefore, the total cost of all the materials = £150 + £134 + £157.5 = £441.50
X = 2y
2x + 2y = 24
So if x = 2y that means 2x = 4y. Which means that 2x + 2y = 24 can be written as 4y + 2y = 24. Simplified to 6y = 24. Now we need to get 1y so we divide both sides by 6, 6y/6 = y and 24/6 = 4. so y = 4. so x= 2y can be written as x = 8.