1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Vanyuwa [196]
3 years ago
15

Which relations are functions and which are not functions?

Mathematics
1 answer:
SCORPION-xisa [38]3 years ago
5 0
1)B
2)A
3)B
4)A
1 has a repeated value of 3
2 has no repeated x values
3 has a repeated value of 4
and d has no repeated x values.
Hope this helps! :)

You might be interested in
® Incorrect<br> Which would show that FGHI is a parallelogram? Select all that apply.
Tatiana [17]

Answer:

FGHI is a Parallelogram

8 0
2 years ago
What is the Slope of a line That contains (2,5) and (3, 1) Sketch the graph. Need help with this question.​
Svetach [21]

Answer:

-4/1

Step-by-step explanation:

To find the slope, first plot the two points we are given on the provided coordinate plain. Then using rise/run (slope) find the distance between the two points going up and over or rising and running. So we go up 4 and over 1, this means the slope is 4/1. Since the line we just graphed is going top left towards bottom right, it is negative.

Pic included...

I hope this helps u!! :)

5 0
3 years ago
Determine the best method to solve the system of equations. Then solve the system.
maxonik [38]

Answer:

x=1  y = -1/2

(1,-1/2)

Step-by-step explanation:

7x-2y=8  

5x+2y=4

I would use elimination since we have 2y in one equation and -2y in the other

7x-2y=8  

5x+2y=4

--------------------

12x = 12

Divide each side by 12

12x/12 = 12/12

x =1

The substitute back into equation 2

5(1) +2y = 4

5 +2y = 4

Subtract 5

5-5+2y = 4-5

2y = -1

Divide by 2

2y/2 = -1/2

y = -1/2

8 0
3 years ago
Read 2 more answers
Amir has 103 days to finsih project he works 7 days a week on the project how many week and days does amir have to finish the pr
aleksandr82 [10.1K]

Answer: 14 weeks 5 days

Step-by-step explanation:

From the question, we are informed that Amir has 103 days to finish a project and that he works 7 days a week on the project.

The number of weeks and days that he has to finish the project will be:

= 103/7

= 14 5/7

= 14 weeks 5 days

5 0
2 years ago
Find The Difference.<br> 1) 8.5-7.6=<br> 2)-2.5-17.8=<br> 3 -2.9-(-7.5)=<br> 4) 3.5-1.9=
Dahasolnce [82]

Answer:

1. 0.9

2. -20.4

3. 4.6

4. 1.6

8 0
3 years ago
Read 2 more answers
Other questions:
  • What is 22% of 60? ​
    12·1 answer
  • Help plzzz Thx thx thx
    10·2 answers
  • What is 66×21? idk help me plz​
    14·1 answer
  • What is the ratio between 1350 and 3600​
    8·1 answer
  • I need help with this problem
    5·2 answers
  • tammy is selling cookies for a fundraiser. she promised to sell 120 boxes by the end of the month. if she has sold 2/3 of her bo
    8·1 answer
  • The volume of the cone shown below is 108pie cm^3. What is the value of H?
    5·2 answers
  • Evaluate 3/4 · 1/2 .
    6·1 answer
  • 1) 2(x + 3) = x - 4<br><br> 2) 4(5x-2)=2(9x+3)
    14·1 answer
  • Two numbers x and y, have a sum of 23 and a difference of 7. x is greater than y
    15·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!