Answer:
CLS
M=2
SUM=0
DO WHILE M<=50
SUM=SUM+M
M=M+2
LOOP
PRINT " The sum of all even numbers between 1 and 50 is"; sum
Answer:
The exec command by interpreter to start new process
Explanation:
On Unix systems, a call to the fork system must be made followed by a call to the e x e c system to begin a new process. The fork call clones the process that is currently running, while the executive call overlays a new process based on a different executable over the calling process.
It is seperate from Kernal because
It Read user commands or a script and execute them, generally turning them into one or more system calls. Is usual It is not part of the kernel since the command interpreter is subject to change.
Answer:
Following are the code to this question:
please find the attached file.
Explanation:
In this code, four class "novels, magazines, technical journals, and textbooks", is defined, in which it holds their respective default constructor and the get and set method to hold the string and integer value, and in the book class the main method is defined, that creates its object and a switch to for search value and print its value.
Answer:
Write out your birthday in the following format: M/DD/YY. For example, if your birthday is on June 11, 2013, it would be written as 6/11/13.
2. Convert the birthday date to binary format. Using our same example from above, 6/11/13 translated into binary code would be: 110/1011/1101.
3. Select one color of bead to represent “0”, a second color to represent “1” and then the third color to represent a space (/) between the numbers.
4. Layout the beads to represent your birthdate in binary code. Don’t forget the third color for the spaces in between the numbers!
5. Once laid out, string all the beads on to the string or pipe cleaner.
6. Tie a knot around the ends and enjoy your one-of-a kind masterpiece as a piece of jewelry or a bag tag….the options are endless!
Answer: Detailed
Explanation:
SDLC consist of 7 phases. They are:
1. Planning.
2. System analysis and requirement
3. Design:
4. Coding:
5. Testing:
6. Installation
7. Maintenance
Here we are talking of the third phase. In this phase it is the design phase which consist of high and low level design. Here the preliminary design is included in high level design where it describes the required hardware, software, network capabilities and the modelling of the interface. However the detailed design in low level design will implement the coding and will finding of any errors in the implemented design as described by the preliminary design.