Answer:
3/4
Step-by-step explanation:
Rise over run.
Go up 3 units and 4 units to the right to find the next point
Answer:
C. 34.15 oz
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

How heavy does a box have to be for it to be labeled overweight?
Top 5%, so X when Z has a pvalue of 1-0.05 = 0.95.
So X when Z = 1.645.




So the correct answer is:
C. 34.15 oz
Answer:
0.4
All you have to do is look up calculator and type 50 times .8%
Answer:

Step-by-step explanation:


Answer:
4.038
Step-by-step explanation:
The simple regression model is:
, then
.
The statistic calculated for the hypothesis test of statistical significance, for the slope, in a simple regression model is given by:

with
the slope estimator,
the value of slope in the null hypothesis and
the standard error of the slope. Thus,
