Answer:
6
Step-by-step explanation:
48 tiles divided by 8 ft is 6 ft
Answer:
1.2-0.8
Step-by-step explanation:
Add 0.4 and 0.8
Answer:

Step-by-step explanation:
Z-score:
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this question:

You listen to the radio station for 1 hour, at a randomly selected time, and carefully observe that the amount of advertising time is equal to 17 minutes. Calculate the z-score for this amount of advertising time.
We have to find Z when X = 17. So



Answer:
(7,2)
Step-by-step explanation:
x + y = 9 + 2x - 3y = 8 is really two equations, and you should show this by separating x + y = 9 from 2x - 3y = 8 through the use of a comma, or the word "and," or through writing only one equation per line.
Here you have the system of linear equations
x + y = 9
2x - 3y = 8.
Let's solve this system by elimination. Mult. the 1st eqn by 3, obtaining the system
3x + 3y = 27
2x - 3y = 8
-------------------
5x = 35, so that x = 7. Subbing 7 for x in x + y = 9, we get 7 + y = 9, indicating that y = 2.
Thus, the solution to this system of equations is (7,2).