Answer:
In the previous years when the country's productivity was increasing t a 75% rate, the unemployment rate must have fallen a lot and the wages must have increased. Since productivity has stopped increasing, the unemployment rate will probably start to rise since their is gap between high labor supply (due to high wages) and a weakening labor demand.
Answer: Your answer would be <u>Size</u> of the markets.
Hope htis helps!
Answer:
The correct answer is B Contract
Explanation:
A lease is a contract outlining the terms under which one party agrees to rent property owned by another party. This contract guarantees the lessee/ tenant use of an asset and guarantees the lessor, the property owner or landlord, regular payments (rent) for a specified period in exchange.
Answer:
$256,284
Explanation:
The computation is shown below:
First, Calculate the predetermined overhead rate per hour which equals to
= (Estimated manufacturing Overhead cost ÷ estimated machine hours)
= ($235,900 ÷ 20,800 hours)
= $11.34 per hour
So, the applied overhead or manufacturing overhead allocated equals to
= Predetermined overhead rate per hour × actual machine hours
= $11.34 per hour × 22,600 hours
= $256,284