X^2+20x+10 that's the answer
This question is incomplete, in that the Excel File: data07-11.xlsx a. was not provided, but I was able to get the information on the Excel File: data07-11.xlsx a. from google as below:
57 61 86 74 72 73
20 57 80 79 83 74
The image of the Excel File: data07-11.xlsx a. is also attached below.
Answer:
a) Point estimate of sample mean = 68
b) Point estimate of standard deviation (4 decimals) = 17.8122
Step-by-step explanation:
a) Point estimate of sample mean, \bar{x} = ∑Xi / n = (57 + 61 + 85 + 74 + 73 + 72 + 20 + 58 + 81 + 78 + 84 + 73)/12 = 68
b) Point estimate of standard deviation = sqrt ∑ Xi² - n\bar{x}² / n-1)
= sqrt(((57 - 68)^2 + (61 - 68)^2 + (85 - 68)^2 + (74 - 68)^2 + (73 - 68)^2 + (72 - 68)^2 + (20 - 68)^2 + (58 - 68)^2 + (81 - 68)^2 + (78 - 68)^2 + (84 - 68)^2 + (73 - 68)^2)/11) = 17.8122
Answer:it will the take 5 mitutes
Step-by-step explanation:
Let x represent the distance at which both companies charge the same amount.
Let y represent the cost of x miles when using company A.
Let z represent the cost of x miles when using company B.
Company A charges a flat fee of $4 plus $2 per mile. It means that
y = 4 + 2x
Company b does not charge a flat fee but charges $2.80 per mile driven. This means that
z = 2.8x
To determine the distance before both plans will be be the same, we would equate both equations. It becomes.
4 + 2x = 2.8x
2.8x - 2x = 4
0.8x = 4
x = 4/0.8 = 5
Answer:
f(x) = (x + 10)(x + 4)(x - 1)
Step-by-step explanation:
Given the zeros of a polynomial, say x = a and x = b, then
the factors are (x - a) and (x - b)
The polynomial is then the product of the factors
f(x) = (x - a)(x - b)
Here the zeros are x = - 10, x = - 4 and x = 1, thus the factors are
(x - (- 10)), (x - (- 4)) and (x - 1), that is
(x + 10), (x + 4) and (x - 1)
f(x) = (x + 10)(x + 4)(x - 1)
Answer:
20.3 yards per second.
Step-by-step explanation:
I THINK, IM NOT 100% SURE