(Probability of getting 5 out of 10 question correct ) = 5/10
= 1/2
I just took the pre-SAT. I thought it was going to be harder than it actually was. When I took it, it took 3 hours. The first part was reading passages and answer questions about it. That was 1 hour. The next part is on grammar. You look at sentences and figure out if they used the right set of words or punctuation. That was 45 min. The 3rd and 4th part was on math. On the third part there was like 12 multiple choice questions and like 4 problems you had to work out. The fourth part had like 21 multiple questions. and 4 problems you had to work out.
Well, from what I know, I believe that it does not. I don't see how it's possible, if y = 7, how does this relate to (0,1), I don't see how it's would be possible. My guess, it would impossible.
In order to get good results in relation to observing water pressure at fixtures, it is good inspection procedural practice to inspect the plumbing fixtures at the "pressure gauges"
<h3>What is plumbing fixtures?</h3>
Plumbing fixtures are the devices that can be linked with a plumbing system to deliver fluid or drain it.
<h3 />
It is common practice for these system to be fitted with a pressure gauges.
Learn more about plumbing fixtures at;
brainly.com/question/12713589
#SPJ1