1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
kondaur [170]
3 years ago
6

Can somebody help me make the 2 equations for each problem. I'm confuzzled

Mathematics
1 answer:
NikAS [45]3 years ago
8 0
We can't see #2 so therefore we can not answer it
You might be interested in
??What's the balance ??
Elza [17]
I think the answer is A because the balance after 4 years is not on their and so we are trying to find the balance after three years. And after 3 years the balance is 805
8 0
3 years ago
Read 2 more answers
The point slope form of the equation of the line that passes through (-5,-1) and (10,-7) is y+7=-2/5(x-10). what is the standard
KIM [24]

Option C

The standard form of the equation for y + 7 = -2/5(x - 10) is 2x + 5y = -15.

<u>Solution:</u>

Need to determine standard form of equation of line passing through points (-5, -1) and (10, -7) and having slope form as  y+7=-\frac{2}{5}(x-10)

Standard form of equation of line is such that terms having variables are on left hand side and constant terms on right hand side.

So let’s simplify given slope form.

y+7=-\frac{2}{5}(x-10)

On opening the brackets we get

y+7=\frac{-2 x+20}{5}

=> 5(y + 7) = -2x +20

=> 5y + 2x = 20 – 35

=> 2x +5y = -15

Hence the standard form is 2x + 5y = -15.

8 0
4 years ago
One year josh had the lowest ERA​ (earned-run average, mean number of runs yielded per nine innings​ pitched) of any male pitche
Anna11 [10]

Answer:

Josh's ERA had a z-score of -3.26.

Alice's ERA had a z-score of -1.11.

Due to the lower z-score(ERA is a stat that the lower the better), Josh had a better year relative to his peers.

Step-by-step explanation:

Z-score:

In a set with mean \mu and standard deviation \sigma, the z-score of a measure X is given by:

Z = \frac{X - \mu}{\sigma}

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.

Josh:

ERA of 2.89, mean of 5.083, standard deviation of 0.672. So

X = 2.89, \mu = 5.083, \sigma = 0.672, and the z-score is:

Z = \frac{X - \mu}{\sigma}

Z = \frac{2.89 - 5.083}{0.672}

Z =  -3.26

Josh's ERA had a z-score of -3.26.

Alice:

ERA of 3.31, mean of 4.032, standard deviation of 0.649. So

X = 3.31, \mu = 4.032, \sigma = 0.649, and the z-score is:

Z = \frac{X - \mu}{\sigma}

Z = \frac{3.31 - 4.032}{0.649}

Z =  -1.11

Alice's ERA had a z-score of -1.11.

Which player had the better year relative to their​ peers, josh or alice ?

Due to the lower z-score(ERA is a stat that the lower the better), Josh had a better year relative to his peers.

8 0
3 years ago
What is the tenth place in the number 478.4819
shtirl [24]

Answer: the tenths spot behind the decimal would be 8

Step-by-step explanation:

4 would be the pnes position , 8 would be the tenths, 1 would be the hundredths and 9 would be in the thousands

3 0
3 years ago
How many pieces of stone slabs, each 24cm long and 15cm broad will be required to lay a path of 18m long and 12m wide?
r-ruslan [8.4K]

Answer:

6,000

Step-by-step explanation:

The computation of the number of pieces of stone slabs required is shown below:

The Area of the path is

= 18 × 12

= 216 square meters

= 2160000 square meters

And, the area of each stone slab is

= 24 × 15

= 360 square centimeters

So, the number of pieces of stone slabs required is

= 2160000 ÷ 360

= 6,000

3 0
3 years ago
Other questions:
  • The speed limit is posted in most areas, but, if not, the ___________ speed limit will be in effect.
    15·1 answer
  • Use completing the square to solve (x + 7)(x – 9) = 25 for x.
    7·2 answers
  • The short sides of a rectangle are 2 inches. The long sides of the same rectangle are three less than an unknown
    12·1 answer
  • The value of n is...
    11·1 answer
  • What is 5(-7x-1)+8(3x+6)​
    7·1 answer
  • I already have an answer, please clarify the correct answer, thx
    7·1 answer
  • Please answer!!!!!! will give brainliest! and will be your friend if u want:)
    7·2 answers
  • Can you help me with this math problem? <br><br> (x+ 2) ^ 2 <br> (squared) <br><br> thankyou
    12·1 answer
  • Plz help, and show details, will give brainliest to best answer
    14·1 answer
  • Mkh-hgrp-cft join fast guys​
    11·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!