1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Zolol [24]
3 years ago
14

Eight over three times three over one

Mathematics
2 answers:
weeeeeb [17]3 years ago
6 0

Answer: 8

Step-by-step explanation: 8/3 x 3/1 = 8

nasty-shy [4]3 years ago
4 0

Answer:

8

Step-by-step explanation:

You might be interested in
What value of n makes the<br> statement true?<br> nx(7 + 8) = (5 x 7) + (5 x 8)
Sindrei [870]

Answer:

n=5

Step-by-step explanation:

i hope this helps :)

3 0
3 years ago
When testing for current in a cable with sixsix ​color-coded wires, the author used a meter to test threethree wires at a time.
Virty [35]

Answer:

20 tests

Step-by-step explanation:

There are six different wires, and for each test the author picks three, this means that each test is a combination of three out of six wires (₆C₃) . The number of total combinations possible is given by:

_6C_3=\frac{6!}{(6-3)!3!}\\_6C_3=\frac{6*5*4}{3*2*1}\\_6C_3=20

20 tests are required to verify every possible pairing of three wires.

7 0
4 years ago
Which of the following fractions is equal to a terminating decimal? A) 1/3 B) 2/5 C) 7/9
Finger [1]

Answer is 2/5

1/5 = 20% = 0.2

2/5 = 40% = 0.4!

1/3 = 0.333...

7/9 = 0.777...

⭐ Please consider brainliest! ⭐

✉️ If any further questions, inbox me! ✉️

7 0
3 years ago
Question 1 of 10
AleksandrR [38]

Answer:

C

Step-by-step explanation:

7 0
4 years ago
A concrete pillar has the shape of a cylinder. It has a diameter of 8 m and a height of 9 m. If concrete cost $87 per cubic mete
krek1111 [17]

Answer:

It will cost $39,337.92 for the piller.

Step-by-step explanation:

Given that,

The diameter of the cylinder, d = 8 m

Height of the cylinder, h = 9 m

If concrete cost $87 per cubic meter, we need to find how much the concrete cost for the pillar.

The volume of the cylinder is given by :

V=\pi r^2h\\\\=3.14\times (4)^2\times 9\\\\=452.16\ m^3

Cost per cubic meter = $87

Cost for 452.16 m³ will be :

C = 452.16 × 87

C = $39,337.92

Hence, it will cost $39,337.92 for the piller.

3 0
3 years ago
Other questions:
  • What percent is 32 out of 80?<br><br><br> 4%<br><br><br> 32%<br><br><br> 40%<br><br><br> 80%
    10·2 answers
  • Why is four squared called four squared
    5·1 answer
  • HeLp!!!!!!!!!!!!!!!!!!!!
    11·1 answer
  • What is the measure of ∠D?
    15·1 answer
  • Blake was working at a wedding . He needed to sort out 184 roses into 8 vases equally .how many roses will be in each vase
    6·1 answer
  • Fifty students voted for either Jon or Emily for class president. Emily received x votes. How many votes did Jon receive?
    9·2 answers
  • -39&lt;5x+36 step by step explanation
    8·1 answer
  • 16 is 40% of what number
    10·2 answers
  • Dont know how to do this and someone please do it for me!
    14·1 answer
  • Find the value of x<br> −3x+5=−1
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!