A road crew must repave a road that is 4/5 miles long. They can repave 1/20 miles each hour. How long will it take the crew to r
epave the road
2 answers:
Answer:
16 hours
Step-by-step explanation:
Total length of the road that needs to be repaved =
miles
Total length of the road which is repaved by the road crew per hour =
miles
Total number of hours required to repave the whole road = (Length of the road to be repaved)/(Length of the road repaved by the crew per hour)
=![\[\frac{4}{5} \div \frac{1}{20}\] ](https://tex.z-dn.net/?f=%5C%5B%5Cfrac%7B4%7D%7B5%7D%20%5Cdiv%20%5Cfrac%7B1%7D%7B20%7D%5C%5D%0A)
=![\[\frac{4}{5} * 20\] ](https://tex.z-dn.net/?f=%5C%5B%5Cfrac%7B4%7D%7B5%7D%20%2A%2020%5C%5D%0A)
= 16 hours
Answer and Step-by-step explanation:


We know that:
→ 
→ 
→
× 
→ 
⇒ 
You might be interested in
Answer: It is A certain.
Step-by-step explanation:
Because all the numbers on a six-sided cube is between 1 and 6 so it is certain or 100/100 that the number will land on a number between 1 and 6.
Answer:
5=y-intercept
Step-by-step explanation:
the y intercept point is when y has a number but x is 0 so we see what is y (f(x)) and it is 5
3/22 is the answer in simplest form
Answer:
1. atmosphere
2.oceans
3.crust
4.inner core
5. outer core
6.mantle
:)
Answer:
2w/5
Step-by-step explanation:
Divide whole numbers by 11,leave the variable.