SAP is a data and business processing platform.
1 .hub
2.server
3.Network Interface
4.Workstation
I’m sorry if I’m wrong :(
I hope it helps
Um, I think the answer to this is probably a mentally ill problem. You should give some options.
Answer:
The loops are nested, and the program ends when loop 1 is completed. Since loop 4 is the innermost one, that one is completed first.