<h2>Numerical expressions are numbers and signs, like below. The following are some examples of numerical expressions, numerical expressions do not use letters.
4 + 20 – 7, (2 + 3) – 7, (6 × 2) ÷ 20, 5 ÷ (20 × 3)
An algebraic expression uses letters and it says you to find "x/y/z".
Example;
4+20xy-7x, (2x+3) - 7y+20.</h2>
Answer:
b
Step-by-step explanation:
Answer:
yes.
Step-by-step explanation:
to find this answer, use the pythagoras theorem. the pythagoras theorem states that a² + b² = c².
to see if this is a right angled triangle, we will use this formula, as the pythagoras theorem only works for right angled triangles.
we are going to work out c, which is always the hypotenuse. the hypotenuse is the longest side of a triangle, that is larger than the other values. we know that the hypotenuse of this triangle is 17, so let’s see if that’s the answer we get.
calculation:
a² + b² = c²
a = 8 millimetres
b = 15 millilitres
c = ?
8² + 15² = c²
64 + 225 = c²
64 + 225 = 289.
289 = c²
√289 = c
√289 = 17.
the pythagoras theorem correctly identified the length of the hypothenuse. as i said earlier, this theorem only works on right angled triangles, therefore, this triangle is right angled.
Answer:
0.1151 = 11.51% probability of completing the project over 20 days.
Step-by-step explanation:
Normal Probability Distribution
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Expected completion time of the project = 22 days.
Variance of project completion time = 2.77
This means that 
What is the probability of completing the project over 20 days?
This is the p-value of Z when X = 20, so:



has a p-value of 0.1151.
0.1151 = 11.51% probability of completing the project over 20 days.