Answer:
Step-by-step explanation:
Weekly wages at a certain factory are
normally distributed. The formula for normal distribution is expressed as
z= (x - u)/s
Where
u = mean
s = standard deviation
x = weekly wages
From the given information,
u = 400
s = 50
The probability that a worker
selected at random makes between
$350 and $400 is expressed as
P(350 lesser than or equal to x lesser than or equal to 400)
For x = 350
z = (350 - 400)/50 = -50/50 = -1
z = -1
From the normal distribution table, the corresponding z score is 0.1587
For x = 400
z = (400 - 400)/50 = 0/50 = 0
z = 0
From the normal distribution table, the corresponding z score is 0.5
P(350 lesser than or equal to x lesser than or equal to 400)
= 0.5 - 0.1587 = 0.3413
Answer:
Give me a second I know this one.
Step-by-step explanation:
...
Which question do you need help with?
Answer:
A. -500
Step-by-step explanation:
Find the slope using rise over run (change in y / change in x)
Find the change in the y values (height of the plane):
24,000 - 18,000
= 6,000
Find the change in the x values (miles from the airport)
(60 - 72)
= -12
Divide 6000 by -12:
6000/-12
= -500
So, the slope of the plane's path is A. -500
Answer:
32/2 or 16.5
Step-by-step explanation: