Answer: environment and society
Explanation:
Since the engineer has been hired in order to get a newer form of electricity, this implies that the engineer will need to get a location that'll be suitable for the wind power system to be developed.
This, an environment hat has lots of breezes and winds will be required to generate the wind power. Also, the engineer will need to study the environment to use a d carry out necessary analysis and feasibility study to know whether the wind powered will be effective. Therefore, the correct option is environment and society.