Answer:
Step-by-step explanation:
Given that a manufacturer makes three types of screws
Type A B C Total
Pack 1000 500 800
P for flaw 0.001 0.03 0.005
Pack*p 1 15 4 20
a) Expected total number of defective screws = 20
b) For one pack each no of defective screws =20
Hence for 5 expected number number of packs form each should be 1/3
Try this solution:
if given dr/dt=8e^t -e^(2t), then
Answer: 8 hours
Step-by-step explanation:
Let x be the time taken by each person to paint the fence.
Given: Tom and Becky can paint Jim's fence together in 12 hours.
Since all people paint at the same rate, then we have the following equation ;-

Thus, the time taken by each person to paint the fence alone = 24 hours
Now, the time taken by all three paint together:-

Hence, it would take 8 hours if all three paint together.
Answer:
a) The variable, M represents the amount of fish Ms. Montesinos has
b) The set equation is 11 + 2 = 3 × M - 2
c) 5
Step-by-step explanation:
The given parameters are;
The number of fishes in Ms. Cruz's tank = 11 fishes
The number of fishes Ms, Cruz has after buying two more fishes = 3 × The amount of fish Ms. Montesinos has - 2 fishes
a) Let the variable, M represent the amount of fish Ms. Montesinos has
b) The set up equation is as follows;
11 + 2 = 3 × M - 2
c) From the equation, 11 + 2 = 3 × M - 2, we have;
13 = 3·M - 2
3·M = 13 + 2 = 15
3·M = 15
M = 15/3 = 5
M = 5
The number of fishes Ms. Montesinos has is 17 fishes
Hello!
I've attached the diagram.
For this problem, since you have a right triangle, you can use the Pythagorean Theorem to fine the length of the ladder (the hypotenuse of the triangle).
Pythagorean Theorem (where c is the hypotenuse):
a² + b² = c²
The triangle's leg lengths are 8 and 6; substitute into the theorem:
8² + 6² = c²
Simplify:
64 + 36 = c²
100 = c²
10 = c
Answer:
The length of the ladder is 10 m.