Answer:
$
Market value of common stocks (6,000 x $25) = 150,000
Market value of preferred stocks (9,000 x $20) = 180,000
Market value of the company 330,000
Proceeds allocated to common stocks
= $150,000/$330,000 x $312,000
= $141,818
The correct answer is B
Explanation:
The market value of the company is the aggregate of market value of common stocks and market value of preferred stocks.The market value of each stock is equal to number of each stock outstanding multiplied by market price per share. Thus, the proceeds allocated to common stock equals the market value of equity divided by market value of the company multiplied by the lump sum.
Answer: digital content transmitted online.
Explanation: This is a new type of communication that allows users to communicate with large audiences online simultaneously. This is done using social media platforms. This is often done in 2 ways: a platform where the audience can watch and react in real time, or a platform where the audience can only watch and listen. During a many - to - many transmission, of the people participating, each individual can post a message and each individual can receive the message. An example of this on social media right now is Instagram live.
please do you mean 1 unit for safety stock or 100 units, will solve for both
Answer:when safety stock =1, Reorder point= 601 units
when safety stock =100, Reorder point= 700 units
Explanation:
Reorder Point (ROP), also called reorder level, is the point of inventoryset by a busness in which it replenishes its stock of items.
given:
Average demand= 200
lead time = 3
when safety stock =1
Reorder point= (Average demand X Delivery lead time ) + Safety stock
= (200 x 3 ) +1 = 601 units
when safety stock = 100
Reorder point= (Average demand X Delivery lead time ) + Safety stock
= (200 x 3 ) +100 = 700 units
Answer:
B. Target costing forces design engineers to explicitly consider the costs of manufacturing and other aspects of business that traditionally fall outside the engineering department
Explanation:
Target costing needs the design engineers to be active in meeting their customers projection, but it must be inside the target cost requirements. Engineers can not afford to just have their attention on the function and form of design, they must also observe cost under Target costing.