Answer: -9
Step-by-step explanation: it is -9 because 3x-3 equals -9. I hope this will help!
Answer:
The maximum value of P is 18
Step-by-step explanation:
we have'the constraints
---> constraint A
---> constraint B
---> constraint C
---> constraint D
using a graphing tool
The solution of the four constraints is the quadrilateral shaded area
The vertices of the quadrilateral area are
(0,0),(3.2,0),(2,6) and (0,7.33)
see the attached figure
To find out the maximum value of the objective function P, substitute the value of x and the value of y of each vertex in the objective function and then compare the results
so
For (0,0) ----> 
For (3.2,0) ----> 
For (2,6) ----> 
For (0,7.33) ----> 
therefore
The maximum value of P is 18
Answer:
after one day, 96.8 % are still there
and from this portion will remain 96.8% one day later
so you multiply 0.968 by itself seven times
0,968^7 = 0.7964
<h3>After one week there are 79.64 % left.</h3>
Answer:
12x+26
Step-by-step explanation:
Just expand braket,then add
Answer:
y =
x + 
Step-by-step explanation:
y = mx + b